Project work

Hotel guest rooms and wine cellars are the two briefs that test a factory hardest: repetition at scale on one side, tolerance and load on the other.

  • 2Project types
  • Per roomTagging and packing
  • In-houseShop drawings

What project buyers ask us for

  • Per-room packing lists. Every unit carries a room code, so the site crew works room by room instead of sorting a container.
  • Shop drawings before production. Coded elevations with appliance niches, drilling patterns and hardware schedule.
  • Staged delivery. Larger programmes can ship in phases to match the construction sequence, with the same batch-matched fronts.
  • Replacement management. Damaged units on site are re-made to the original drawing and shipped with the next container.

Start a project

Send the room schedule

A unit mix and a typical room drawing are enough for us to price a hotel programme. For cellars, send the room dimensions and the collection size.

Project enquiry

Tell us the product, the quantity and the destination port. If you have drawings, mention it and we will send an upload link.

WhatsApp instead

Your details are used only to answer this enquiry. No newsletter, no resale of data.